Control joints
A control cut creates a planned line for shrinkage cracking. The specified layout, depth and timing matter, especially when the cut is part of a new slab pour.
Slab joints, utility openings & pavement preparation
Our crew uses a walk-behind floor saw with a diamond blade to cut concrete floors and slabs for joints, plumbing, electrical runs and French drains. We also saw-cut asphalt along the curb line as part of trench-curb preparation.

Green EDCO walk-behind pavement saw wet-cutting asphalt. AI recreation based on NORCO’s jobsite footage.
A control cut creates a planned line for shrinkage cracking. The specified layout, depth and timing matter, especially when the cut is part of a new slab pour.
Parallel cuts can define the edges of a strip for a plumbing or electrical run. Marking the route and the required opening width helps establish the cutting scope.
Saw-cutting can open a route through an existing slab for a drain. The drain layout determines the path the cut needs to follow.
Share the slab thickness if known, total cut length and the required depth or opening width. A marked-up plan or photo is useful.
Identify access for the walk-behind saw, nearby walls or finished surfaces, and any known embedded utilities or reinforcement for the crew to review.
Let Ben know whether the job calls for joint cutting or an opening for another trade, and who will handle removal and follow-on work.